Three factors of affecting the cost of steel structure plant
The steel structure workshop is destined to have a strong construction market share due to its beautiful appearance, short construction period, high degree of industrialization and resource reuse. The cost of steel structure workshop is also a concern of many people. It can be used to control the cost and the technical advantage of steel structure plant. It is the key research object of many steel structure enterprises.
There are three main factors in the cost of steel structure plant:
A, raw material factors
Steel and sheet are the main components of the steel structure plant, accounting for about 70%-80% of the total cost of the steel structure. The fluctuation of the market price of steel structure raw materials directly affects the cost of the steel structure plant. The material of the section steel differs greatly from the price of the carrier surface and the thickness of the panel and the material. The raw material of steel structure is the main factor in the construction cost of the shadow steel structure plant.
B, design factors
Reasonable design is the fundamental problem of saving raw materials to control the cost of steel structure plants. Different design schemes of steel structure workshops are important reasons for the change of raw material quantity, which directly affects the total cost of steel structure workshops.
C, construction and installation factors
The length of the construction period is also part of the cost of the steel structure plant. The proficiency of the installation technology is the main reason for the length of the construction period. The construction of the structural plant is a systematic project involving a wide range of factors and many influencing factors. The construction period, policy changes, and large amount of engineering can all affect the cost of the steel structure plant.